{"id":6484,"date":"2024-12-03T11:46:11","date_gmt":"2024-12-03T11:46:11","guid":{"rendered":"https:\/\/hesiad.org.tr\/%f0%9f%94%94-hesiad-olarak-turkiyenin-ilk-barajlar-ve-hidroelektrik-santralleri-zirvesine-son-1-gun-%f0%9f%94%94-copy\/"},"modified":"2024-12-31T13:13:07","modified_gmt":"2024-12-31T13:13:07","slug":"dams-and-hydropower-turkiye-summit-2024-hesiad-baskanimiz-sayin-elvan-tugsuz-guvenin-etkileyici-acilis-konusmasiyla-basladi","status":"publish","type":"post","link":"https:\/\/hesiad.org.tr\/en\/dams-and-hydropower-turkiye-summit-2024-hesiad-baskanimiz-sayin-elvan-tugsuz-guvenin-etkileyici-acilis-konusmasiyla-basladi\/","title":{"rendered":"&#x1f30d; Dams and Hydropower T\u00fcrkiye Summit 2024, HES\u0130AD Ba\u015fkan\u0131m\u0131z Say\u0131n Elvan Tu\u011fsuz G\u00fcven\u2019in Sekt\u00f6r\u00fcn Gelece\u011fine Y\u00f6nelik Vizyon Payla\u015f\u0131m\u0131yla Ba\u015flad\u0131 &#x1f30d;"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"6484\" class=\"elementor elementor-6484\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-433bd252 e-flex e-con-boxed e-con e-parent\" data-id=\"433bd252\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d36a14b elementor-widget elementor-widget-text-editor\" data-id=\"d36a14b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Dams and Hydropower T\u00fcrkiye Summit 2024, HES\u0130AD Ba\u015fkan\u0131m\u0131z Say\u0131n Elvan Tu\u011fsuz G\u00fcven\u2019in etkileyici a\u00e7\u0131l\u0131\u015f konu\u015fmas\u0131yla ba\u015flad\u0131. Ba\u015fkan\u0131m\u0131z, T\u00fcrkiye&#8217;nin hidroelektrik sekt\u00f6r\u00fc ve gelece\u011fine dair \u00f6nemli vizyonunu kat\u0131l\u0131mc\u0131larla payla\u015ft\u0131. Konu\u015fmas\u0131nda dikkat \u00e7eken ba\u015fl\u0131ca temalar \u015fu \u015fekilde:<\/p><h4><strong>Hidroelektrik Enerjide Liderlik<\/strong><\/h4><p>Kas\u0131m 2024 itibar\u0131yla T\u00fcrkiye&#8217;nin hidroelektrik kurulu g\u00fcc\u00fc 32.203 MW\u2019a ula\u015farak, t\u00fcm yenilenebilir enerji kaynaklar\u0131 aras\u0131nda liderli\u011fini s\u00fcrd\u00fcr\u00fcyor. \u00d6zel sekt\u00f6r\u00fcn yat\u0131r\u0131mlar\u0131, 16.057 MW\u2019l\u0131k pay ve yakla\u015f\u0131k 28 milyar dolarl\u0131k hacmiyle sekt\u00f6re b\u00fcy\u00fck katk\u0131 sa\u011fl\u0131yor.<\/p><h4><strong>\u0130stihdam ve \u00dcretim Katk\u0131s\u0131<\/strong><\/h4><p>Barajl\u0131 santral say\u0131s\u0131 147&#8217;ye, toplam kurulu g\u00fc\u00e7 ise 23.863 MW&#8217;a ula\u015ft\u0131. Yan sekt\u00f6rlerle birlikte 30.000 ki\u015fiye istihdam sa\u011flan\u0131yor. 2024 Aral\u0131k verilerine g\u00f6re hidroelektrik santrallerimiz, \u00fclkemizin toplam elektrik \u00fcretimine %22,90 oran\u0131nda katk\u0131 sa\u011flad\u0131 ve enerji ithalat\u0131n\u0131 %23 oran\u0131nda azaltt\u0131.<\/p><h4><strong>B\u00fcy\u00fcme ve Gelecek Hedefleri<\/strong><\/h4><p>2005\u2019te 12.975 MW olan hidroelektrik kurulu g\u00fcc\u00fcm\u00fcz, 2015\u2019te 25.900 MW\u2019a y\u00fckseldi. 2024 itibar\u0131yla bu kapasite 32.200 MW\u2019a ula\u015fm\u0131\u015f durumda. Her y\u0131l yakla\u015f\u0131k 1.000 MW\u2019l\u0131k kapasite kazand\u0131rarak 20 y\u0131lda b\u00fcy\u00fck bir geli\u015fim sa\u011flad\u0131k. 2035 hedefimiz, toplam hidroelektrik kurulu g\u00fcc\u00fcm\u00fcz\u00fc 35.000 MW\u2019a \u00e7\u0131karmak, ancak mevcut verilere g\u00f6re bu hedefin daha da yukar\u0131ya \u00e7ekilmesi gerekti\u011fi ifade ediliyor.<\/p><h4><strong>Yat\u0131r\u0131m Potansiyeli ve Strateji<\/strong><\/h4><p>DS\u0130 verilerine g\u00f6re, T\u00fcrkiye&#8217;nin hidroelektrik potansiyelinde halen 180.000 gigavatsaatlik yat\u0131r\u0131m yap\u0131labilir bir kapasite bulunuyor. Bu potansiyel, enerji arz g\u00fcvenli\u011fi ve cari a\u00e7\u0131\u011f\u0131n \u00f6nlenmesi a\u00e7\u0131s\u0131ndan kritik \u00f6nem ta\u015f\u0131yor.<\/p><h4><strong>Hedefler ve Zirvenin Amac\u0131<\/strong><\/h4><p>Bu zirveyle hibrit projeler, pompajl\u0131 depolama \u00e7\u00f6z\u00fcmleri ve havza su y\u00f6netimi gibi \u00f6nemli ba\u015fl\u0131klarda iyi modellerin yayg\u0131nla\u015ft\u0131r\u0131lmas\u0131 ve sekt\u00f6rel yat\u0131r\u0131mlar\u0131n h\u0131zland\u0131r\u0131lmas\u0131 hedefleniyor.<\/p><p>Say\u0131n Elvan Tu\u011fsuz G\u00fcven, konu\u015fmas\u0131nda sekt\u00f6r\u00fcn g\u00f6n\u00fcll\u00fcl\u00fck anlay\u0131\u015f\u0131 ile \u00e7al\u0131\u015fan \u00f6zel sekt\u00f6r temsilcileri ve d\u00fczenleyici kurulu\u015flar aras\u0131ndaki i\u015f birli\u011finin \u00f6nemine bir kez daha dikkat \u00e7ekti.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Dams and Hydropower T\u00fcrkiye Summit 2024, HES\u0130AD Ba\u015fkan\u0131m\u0131z Say\u0131n Elvan Tu\u011fsuz G\u00fcven\u2019in etkileyici a\u00e7\u0131l\u0131\u015f konu\u015fmas\u0131yla ba\u015flad\u0131. Ba\u015fkan\u0131m\u0131z, T\u00fcrkiye&#8217;nin hidroelektrik sekt\u00f6r\u00fc ve gelece\u011fine dair \u00f6nemli vizyonunu kat\u0131l\u0131mc\u0131larla payla\u015ft\u0131. Konu\u015fmas\u0131nda dikkat \u00e7eken ba\u015fl\u0131ca temalar \u015fu \u015fekilde: Hidroelektrik Enerjide Liderlik Kas\u0131m 2024 itibar\u0131yla T\u00fcrkiye&#8217;nin hidroelektrik kurulu g\u00fcc\u00fc 32.203 MW\u2019a ula\u015farak, t\u00fcm yenilenebilir enerji kaynaklar\u0131 aras\u0131nda liderli\u011fini s\u00fcrd\u00fcr\u00fcyor. \u00d6zel&#8230;<\/p>","protected":false},"author":2,"featured_media":6520,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[27],"tags":[],"class_list":{"0":"post-6484","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","6":"hentry","7":"category-hesiad-haberler","8":"nt-post-class","9":"","15":"excerpt-none"},"acf":[],"_links":{"self":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts\/6484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/comments?post=6484"}],"version-history":[{"count":11,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts\/6484\/revisions"}],"predecessor-version":[{"id":6524,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts\/6484\/revisions\/6524"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/media\/6520"}],"wp:attachment":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/media?parent=6484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/categories?post=6484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/tags?post=6484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}