{"id":6567,"date":"2024-12-04T16:46:32","date_gmt":"2024-12-04T16:46:32","guid":{"rendered":"https:\/\/hesiad.org.tr\/dams-and-hydropower-turkiye-summit-2024-hesiad-baskanimiz-elvan-tugsuz-guvenin-acilis-konusmasiyla-gelecegi-sekillendiren-adimlar-copy\/"},"modified":"2024-12-31T16:10:15","modified_gmt":"2024-12-31T16:10:15","slug":"dsi-genel-mudur-yardimcisi-cengiz-han-kilicaslandan-hidroelektrik-sektorune-degerli-vurgular","status":"publish","type":"post","link":"https:\/\/hesiad.org.tr\/en\/dsi-genel-mudur-yardimcisi-cengiz-han-kilicaslandan-hidroelektrik-sektorune-degerli-vurgular\/","title":{"rendered":"DS\u0130 Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Cengiz Han KILI\u00c7ASLAN\u2019dan Hidroelektrik Sekt\u00f6r\u00fcne De\u011ferli Vurgular"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"6567\" class=\"elementor elementor-6567\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-433bd252 e-flex e-con-boxed e-con e-parent\" data-id=\"433bd252\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d36a14b elementor-widget elementor-widget-text-editor\" data-id=\"d36a14b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Zirvemizin 2. g\u00fcn\u00fcnde, DSI Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Cengiz Han K\u0131l\u0131\u00e7aslan, hidroelektrik enerji sekt\u00f6r\u00fcyle ilgili \u00f6nemli de\u011ferlendirmelerde bulundu. Yenilenebilir enerji kaynaklar\u0131n\u0131n kurulu g\u00fc\u00e7 i\u00e7indeki katk\u0131s\u0131n\u0131n %59\u2019a ula\u015fsa da enerji \u00fcretimindeki katk\u0131s\u0131n\u0131n %47&#8217;de kalmas\u0131n\u0131n sebepleri tart\u0131\u015f\u0131ld\u0131. Ayr\u0131ca, hidroelektrik enerjiye y\u00f6nelik yanl\u0131\u015f alg\u0131lara dikkat \u00e7ekildi ve hidroelektrik enerjinin d\u00fczenli enerji \u00fcretme kapasitesinin \u00f6nemine vurgu yap\u0131ld\u0131. K\u0131l\u0131\u00e7aslan, iklim de\u011fi\u015fikli\u011finin etkisiyle ya\u015fanan su eksikliklerine kar\u015f\u0131, hidroelektrik santrallerinin hibrit sistemlerle daha verimli hale getirilmesinin gereklili\u011fini belirtti.<\/p><p><strong>\u00d6ne \u00c7\u0131kan Noktalar:<\/strong><\/p><ul><li><p><strong>Kurulu G\u00fc\u00e7 ve Hedefler:<\/strong><br \/>T\u00fcrkiye genelinde 750 hidroelektrik santral (HES) bulunmakta, toplam kurulu g\u00fc\u00e7 32.400 MW ve y\u0131ll\u0131k enerji \u00fcretimi 112 milyar kWh seviyesindedir. 2024-2028 aras\u0131nda 4.620 MW\u2019l\u0131k yeni kapasite hedeflenmektedir.<\/p><\/li><li><p><strong>Hidroelektrik Enerji ve Yanl\u0131\u015f Alg\u0131lar:<\/strong><br \/>Hidroelektrik enerjinin, d\u00fczenli enerji \u00fcretemeyen di\u011fer yenilenebilir kaynaklar aras\u0131nda alternatifsiz bir kaynak oldu\u011fu vurguland\u0131. Bu do\u011frultuda, hidroelektrik enerjinin potansiyeli ve \u00e7evreye olan katk\u0131lar\u0131 hakk\u0131nda fark\u0131ndal\u0131k olu\u015fturulmas\u0131 gerekti\u011fi ifade edildi.<\/p><\/li><li><p><strong>Hibrit Sistemler ve Yenilik\u00e7i Yat\u0131r\u0131mlar:<\/strong><br \/>HES\u2019lerin, RES ve GES ile hibrit sistemler olu\u015fturmas\u0131 gerekti\u011fi ve b\u00fcy\u00fck projeler aras\u0131nda yer alan Yusufeli Baraj\u0131 gibi m\u00fchendislik ba\u015far\u0131lar\u0131n\u0131n sekt\u00f6re katk\u0131lar\u0131 tart\u0131\u015f\u0131ld\u0131. Yusufeli Baraj\u0131, temelden 275 metre y\u00fcksekli\u011fi ile d\u00fcnyada kendi s\u0131n\u0131f\u0131nda 5. s\u0131rada yer almaktad\u0131r.<\/p><\/li><li><p><strong>Y\u00fczer GES ve Verimlilik Art\u0131\u015f\u0131:<\/strong><br \/>Keban Baraj\u0131\u2019ndaki 1 MW\u2019l\u0131k y\u00fczer GES pilot \u00e7al\u0131\u015fmas\u0131yla buharla\u015fma kay\u0131plar\u0131n\u0131n azalt\u0131labilece\u011fi ve %10 daha fazla enerji \u00fcretilebilece\u011fi ortaya kondu. T\u00fcrkiye&#8217;nin y\u00fczey potansiyelinin sadece %10&#8217;unu kullanarak 50.000 MW\u2019l\u0131k kurulu g\u00fc\u00e7 elde edilebilece\u011fi vurguland\u0131.<\/p><\/li><li><p><strong>E\u011fitim ve Verimlilik:<\/strong><br \/>Sekt\u00f6rde daha nitelikli personel istihdam\u0131n\u0131n \u00f6nemine dikkat \u00e7ekildi ve su ihtiyac\u0131n\u0131n artt\u0131\u011f\u0131 \u0130\u00e7 Anadolu ve Bat\u0131 b\u00f6lgelerindeki su projeleri i\u00e7in enerji projelerinin \u00f6ncelik s\u0131ralamas\u0131nda ya\u015fanan zorluklar ele al\u0131nd\u0131.<\/p><\/li><\/ul><p>Bu de\u011ferlendirmeler, hidroelektrik sekt\u00f6r\u00fcndeki s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nma hedeflerinin g\u00fc\u00e7lendirilmesi ve sekt\u00f6rdeki verimlili\u011fin art\u0131r\u0131lmas\u0131 gerekti\u011fini bir kez daha g\u00f6zler \u00f6n\u00fcne serdi.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Zirvemizin 2. g\u00fcn\u00fcnde, DSI Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Cengiz Han K\u0131l\u0131\u00e7aslan, hidroelektrik enerji sekt\u00f6r\u00fcyle ilgili \u00f6nemli de\u011ferlendirmelerde bulundu. Yenilenebilir enerji kaynaklar\u0131n\u0131n kurulu g\u00fc\u00e7 i\u00e7indeki katk\u0131s\u0131n\u0131n %59\u2019a ula\u015fsa da enerji \u00fcretimindeki katk\u0131s\u0131n\u0131n %47&#8217;de kalmas\u0131n\u0131n sebepleri tart\u0131\u015f\u0131ld\u0131. Ayr\u0131ca, hidroelektrik enerjiye y\u00f6nelik yanl\u0131\u015f alg\u0131lara dikkat \u00e7ekildi ve hidroelektrik enerjinin d\u00fczenli enerji \u00fcretme kapasitesinin \u00f6nemine vurgu yap\u0131ld\u0131. K\u0131l\u0131\u00e7aslan, iklim de\u011fi\u015fikli\u011finin&#8230;<\/p>","protected":false},"author":2,"featured_media":6581,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[27],"tags":[],"class_list":{"0":"post-6567","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","6":"hentry","7":"category-hesiad-haberler","8":"nt-post-class","9":"","15":"excerpt-none"},"acf":[],"_links":{"self":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts\/6567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/comments?post=6567"}],"version-history":[{"count":4,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts\/6567\/revisions"}],"predecessor-version":[{"id":6584,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/posts\/6567\/revisions\/6584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/media\/6581"}],"wp:attachment":[{"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/media?parent=6567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/categories?post=6567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hesiad.org.tr\/en\/wp-json\/wp\/v2\/tags?post=6567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}